PROJECT AT A GLANCE

District Covered

00

Total Labs

00

Total Pathologist

00

Total Doctors

00

Paramedic Staff

00

Phlebotomist

00

Runner Boys

00

Camp Co-Coordinators

00


Camp Process
  • Camp location will be identified and strategically placed with minimum travelling for Construction workers and preferably on construction site which will have banners, pandal, and seating arrangement.
  • Awareness campaign to ensure the dates and procedures to be followed before coming to the health screening program.
  • Transport arrangement for workers to and fro camp location if required will be arranged.
  • Camp of 100-200 persons will be organized with all manpower (Medical Doctors, Nursing staff, Paramedical team and Phlebotomist for blood collection) and required equipment
  • Registration will be done using the MBOCWWB registration number
  • New construction workers can be enrolled onsite and their approval can be made by MBOCWWB authorities and the checkup can be done
  • Snacks & Beverages will be provided
  • Health counselling will be given to all workers and a health guide will be given with visual in local language to workers

The health checkup package includes following:

  • Physical Examination
  • Lung Function Test
  • Audio Screening Test
  • Vision Screening
  • Blood & Urine test: (Laboratory Investigations)
    • Complete Blood Count (CBC)
    • Random Sugar (Rapid)
    • Liver Function Test
    • Renal Function Test
    • Lipid Profile
    • Malaria Parasite
    • Thyroid Function Test
    • Iron
    • GGT
    • Magnesium
    • ESR
    • Urine Routine

The blood sample collected shall be tested and reported from Hindlabs in the respective districts.

  • Electronic Heath card will be issued to each construction worker, which will store his Health records and can be accessed anywhere, anytime. Health report is printed with photo of the beneficiaries and handed over to them and acknowledgement is taken.
  • Electronic Medical records will be made available on central dashboard of Welfare board. Statistical data of disease wise will be displayed to secured login of authorities
  • Heath status and Health Index baseline will be given
  • All Construction Workers who are Diagnosed with any Critical Health Problem or Disease will be taken to Nearest Government Health Centre or MPJPAY Empanelled Hospital by our Health Coordinator
  • Dedicated Call Centre with Helpline will be Provided for any Queries
Camp Layout

Technology in use
TAT
Highest and Lowest Patient count - Facility Type wise
No of Critical Results Last 7 days
Facility Type Patients
No of Abnormal Results Last 7 days
Facility Type Patients